Aerial view of rural infrastructure

Industries We Serve

Aerial data services tailored by industry.

Each industry has different assets, deliverables, and operating considerations. Below is a summary of what we inspect, what you receive, and where our services stop.

Inspection limitations

Cox Aerial Solutions LLC provides remote, non-destructive aerial observations and informational deliverables based on conditions visible to the selected sensors during the inspection period. Services do not constitute professional engineering, electrical contracting, roofing contracting, code certification, structural certification, land surveying, repair instruction, or a guarantee that every defect or hazard will be detected. Final severity, cause, maintenance action, repair, shutdown, switching, and engineering decisions remain with qualified customer personnel.

Energy

Electric Utility Inspections

Assets we inspect

  • Distribution and transmission line corridors
  • Poles, crossarms, insulators, and connections
  • Reclosers, switches, and cutouts
  • Substation approaches and right-of-way

What you receive

  • Thermal + visual imagery with GPS-tagged findings
  • Observation priority categorization
  • Observation-based priority categories for customer evaluation

Operational limitations

Operations subject to FAA airspace, weather, and safe operating conditions. Not a substitute for engineering analysis. Reports organize documented visual and thermal observations into customer-evaluation priority categories. Final maintenance, operational, testing, and repair decisions remain the responsibility of the customer and its qualified personnel.

Typical turnaround

Standard report target: five Business Days. Professional or Advanced report target: seven Business Days. Tier 6 Advanced Reports are guaranteed within three Business Days under the Tier 6 Agreement. Timelines begin after field collection is complete and all required customer information has been received.

Energy

Substation Thermal Inspections

Assets we inspect

  • Transformers and bushings
  • Switchgear, breakers, and disconnects
  • Bus connections and jumpers
  • Battery banks and control enclosures (exterior)

What you receive

  • Component-level thermal images
  • Temperature differential analysis on suspect connections
  • Facility overview and equipment inventory imagery

Operational limitations

Inspections conducted from safe airspace. Energized-equipment testing and internal component testing are not performed.

Typical turnaround

Standard report target: five Business Days. Professional or Advanced report target: seven Business Days. Tier 6 Advanced Reports are guaranteed within three Business Days under the Tier 6 Agreement. Timelines begin after field collection is complete and all required customer information has been received.

Renewable Energy

Solar Facility Inspections

Assets we inspect

  • Photovoltaic module arrays
  • Combiner boxes and inverters (exterior thermal signature)
  • DC/AC infrastructure visible from above

What you receive

  • Module-level apparent thermal-pattern documentation
  • Documentation of apparent string or array thermal variations
  • Observation locations for qualified customer or O&M-provider evaluation
  • Site overview orthomosaic (optional)

Operational limitations

Thermal imagery documents apparent thermal patterns for evaluation by qualified customer or O&M personnel.

Typical turnaround

Standard report target: five Business Days. Professional or Advanced report target: seven Business Days. Tier 6 Advanced Reports are guaranteed within three Business Days under the Tier 6 Agreement. Timelines begin after field collection is complete and all required customer information has been received.

Building Envelope

Commercial Roof Thermal Inspections

Assets we inspect

  • Flat and low-slope commercial membranes
  • Metal, TPO, EPDM, modified bitumen, and BUR systems
  • Rooftop penetrations and equipment curbs

What you receive

  • Thermal anomaly maps with visual reference imagery
  • Apparent thermal patterns consistent with areas warranting moisture verification, highlighted with GPS coordinates
  • Executive or professional-level written report

Operational limitations

Thermal imaging identifies patterns and suspected moisture-related anomalies. It does not replace destructive testing, moisture-meter verification, engineering analysis, roofing-contractor evaluation, or professional building-envelope assessment where required.

Typical turnaround

Standard report target: five Business Days. Professional or Advanced report target: seven Business Days. Tier 6 Advanced Reports are guaranteed within three Business Days under the Tier 6 Agreement. Timelines begin after field collection is complete and all required customer information has been received.

Construction & Mapping

Construction Progress Documentation

Assets we inspect

  • Site progression imagery for commercial and industrial projects
  • Stockpile and material staging documentation
  • Orthomosaic maps and elevation visualization

What you receive

  • Dated progress photography
  • Orthomosaic maps and 3D reconstructions
  • Volumetric estimates for stockpiles (non-survey)

Operational limitations

Aerial products are for planning, documentation, and general reference. Not a licensed land survey or engineering deliverable.

Typical turnaround

Delivery timing is project-specific and will be stated in the approved Scope of Work or Project Order.

Agriculture & Land

Agricultural Mapping & Documentation

Assets we inspect

  • Row crop and pasture acreage
  • Center pivots, tanks, and ag infrastructure
  • Waterway, terrace, and erosion visualization

What you receive

  • High-resolution RGB imagery
  • Orthomosaic mapping
  • Drainage and field-condition documentation
  • Approximate acreage measurements for planning reference

Operational limitations

Observations identify relative patterns and potential scouting areas. Deliverables are not agronomic prescriptions, disease or nutrient diagnoses, irrigation recommendations, chemical treatment advice, or yield predictions.

Typical turnaround

Delivery timing is project-specific and will be stated in the approved Scope of Work or Project Order.

Telecommunications

Telecommunications Inspections

Assets we inspect

  • Communication towers, monopoles, and lattice structures
  • Antennas, mounts, and cable runs (visual)
  • Ground compound and shelter exteriors

What you receive

  • High-resolution close-up imagery of tower structure
  • Visual documentation for asset records
  • Optional thermal imagery of shelter and equipment enclosures

Operational limitations

Inspections performed under FAA Part 107 and site owner requirements. Structural certification and RF analysis are provided by qualified specialists — not by Cox Aerial Solutions LLC.

Typical turnaround

Standard report target: five Business Days. Professional or Advanced report target: seven Business Days. Tier 6 Advanced Reports are guaranteed within three Business Days under the Tier 6 Agreement. Timelines begin after field collection is complete and all required customer information has been received.

Real Estate

Real Estate Media

Assets we inspect

  • Residential, luxury, and agricultural listings
  • Land parcels and estates
  • Commercial property exteriors

What you receive

  • Aerial photography and cinematic video
  • Twilight, exterior, and lifestyle imagery
  • 360° tours (optional)

Operational limitations

Marketing media only — not an appraisal or property survey.

Typical turnaround

Delivery timing is project-specific and will be stated in the approved Scope of Work or Project Order.